Job order December 17, 2009
Posted by khmerwiz2008 in adc job set up.add a comment
They don’t have much job order but they still want me to come to work even though I request vacation time.
Tonight I have nothing to do beside get the hot job done. There are a few hot prototype that o need to program.
As shown in this pictue, there are not much job on the shelf.
Leaking May 16, 2009
Posted by khmerwiz2008 in adc job set up.add a comment
this pedal is not safe to operate under the leaking condition. Machine should be lockout entirely.
Who will they blame ? September 27, 2008
Posted by khmerwiz2008 in Uncategorized.add a comment
Who will they blame for this, let see?
334073.1 August 14, 2008
Posted by khmerwiz2008 in Uncategorized.add a comment
This job need the following bottom die
…..33′…200,500..space 5mm 45,300. The 5mm space between the sets of die is really important. It needs for the 1′ bend (blank 14′).
Leave no space between the set punches.
50,500,500 top punches
This job is the opposit side of job number 334075
350047-702 August 10, 2008
Posted by khmerwiz2008 in adc job set up.add a comment
Left rail to the first set 46′
Layout
|….46….100,50..10mm space.. 500
319476-704 August 9, 2008
Posted by khmerwiz2008 in Uncategorized.add a comment
——28.5′–300mm–3.5′—100mm–7′–25,40mm
Same top and bottom dies and punches except the top above the 100mm. The punches should 50,45 mm.
345050-704 August 7, 2008
Posted by khmerwiz2008 in adc job set up.add a comment
This job need only one setup to finish the entire job. Dies and Punches layout as following just for the suggestion.
Measure from the left rails—–20.5′—500,500,25mm. Left no space between the bottom dies.
For the top punches have the following layout:
First sets line on the left egde with the top.
100,200,50,25,40,100 space 500mm. The right edge line up with the top punches
345207 August 3, 2008
Posted by khmerwiz2008 in adc job set up.add a comment
This job need die and punches
500mm top and bottom, right and easy setup end with xx. Ref Mac# T702
The bottom dies position start from
|…… 44′ ……[500mm]….
345416-703 July 30, 2008
Posted by khmerwiz2008 in Uncategorized.add a comment
Use punches 5 die ev/s w8
—21′–100..300,500…20′…200,40,45
Top and bottom dies/punches are the same lenght.
345387 July 30, 2008
Posted by khmerwiz2008 in Uncategorized.add a comment
100 wing,35,30,100,100 wing 202k
500 evs w8
This job was setup in trupmf 702